Valves for Sierra Leone Charlotte Hydroelectric Power Plant

Sierra Leone Charlotte Hydroelectric (1-30MW) Power Plant

Sierra Leone Charlotte Hydroelectric Power Plant is a diversion power station located on the Orugo river about 15km southwest of Freetown, the capital of Sierra Leone in Eest Africa. Its main task is to generate electricity. It is one of the 100 clean energy projects funded by China.The total installed capacity of the power station is 2200kW, the single capacity of 2 large machines is 1000kW, and the capacity of 1 small machine is 200kW. The average annual generating capacity is 3.651 million kw·h.

ZECO VALVE Supplier provides basic industrial valves such as stainless steel globe valves, strainers, gate valves and control valves for Charlotte hydroelectric power station.

Production Field

Packing List:

  • Stainless Steel Globe Valve 2inch~10inch
  • Stainless Steel Gate Valve 2inch~10inch
  • Strainer 2inch~10inch
  • Pressure Control Valve 4inch~10inch
  • Flange Check Valve 4inch~10inch

Client Feedback:

ZECO valve, as an equipment unit built by China in Africa, provides Sierra Leone with high-quality valves to maintain the operation of hydropower power plant.

Share this article:
Facebook
Twitter
LinkedIn
Reddit
Pinterest

Product Enquiry

en_USEnglish

Get a free quote

Contact Form Demo